[{"data":1,"prerenderedAt":61},["ShallowReactive",2],{"formation-formation-gestion-de-crise-definir-sa-strategie-de-1ers-prelevements":3},{"title":4,"slug":7,"alsoIn":8,"summary":10,"challenges":13,"objectives":20,"program":27,"audience":34,"prerequisites":38,"modalities":42,"assessment":46,"regulatoryScope":50,"duration":53,"goal":55,"note":58},{"fr":5,"en":6},"Formation gestion de crise : Définir sa stratégie de 1ers prélèvements environnementaux","Crisis management training: Defining your strategy for initial environmental sampling","formation-gestion-de-crise-definir-sa-strategie-de-1ers-prelevements",[9],"incendie",{"fr":11,"en":12},"Une journée pour comprendre le cadre réglementaire des plans d’urgence relatif aux premiers prélèvements environnementaux et définir sa stratégie.","A day to understand the emergency plan regulations on initial environmental sampling and define one’s strategy.",[14,17],{"fr":15,"en":16},"Les premiers prélèvements se décident dans l’urgence, alors qu’ils servent plus tard à documenter l’impact et à répondre aux autorités.","First samples are decided in the emergency yet later serve to document the impact and answer authorities.",{"fr":18,"en":19},"Il faut savoir qui prélève, avec quel matériel et selon quel protocole, avant l’événement.","It must be known who samples, with what equipment and under what protocol before the event.",[21,24],{"fr":22,"en":23},"Structurer l’organisation, les rôles et les outils de gestion de crise.","Structure the organisation, roles and tools for crisis management.",{"fr":25,"en":26},"Exercer et améliorer le dispositif via des mises en situation.","Exercise and improve the arrangements through simulations.",[28,31],{"fr":29,"en":30},"Organisation, rôles et outils de la gestion de crise.","Organisation, roles and tools for crisis management.",{"fr":32,"en":33},"Mise en situation, retour d’expérience et amélioration du dispositif.","Simulation, lessons learned and improving the arrangements.",[35],{"fr":36,"en":37},"Direction, QHSE et membres de l’organisation de crise ou du POI.","Management, QHSE staff and members of the crisis organisation or POI.",[39],{"fr":40,"en":41},"Connaissance du site et de ses risques recommandée.","Knowledge of the site and its risks recommended.",[43],{"fr":44,"en":45},"Formation en présentiel, études de cas et exercice sur table.","In-person training, case studies and tabletop exercise.",[47],{"fr":48,"en":49},"Observation d’une mise en situation ou d’un exercice.","Observation of a simulation or exercise.",{"fr":51,"en":52},"Le dispositif (POI, cellule de crise) doit être adapté aux exigences applicables au site, au secteur et au pays concernés, notamment pour les installations classées.","Arrangements (POI, crisis unit) must be adapted to the requirements applicable to the site, sector and country concerned, particularly for regulated industrial facilities.",{"fr":54,"en":54},"1 Jour",{"fr":56,"en":57},"Comprendre la réglementation des plans d'urgences autour des premiers prélèvements environnementaux","Understand the regulations on emergency plans relating to initial environmental sampling",{"fr":59,"en":60},"Modalité : Présentiel. Programme et prérequis sur demande.","Format: Présentiel. Programme and prerequisites on request.",1793205042802]